Closed equipment arrangement
The enclosed design helps contain wastewater and grease within a serviceable system. Venting and odour management must still follow the approved project design.
ENGINEERED KITCHEN SYSTEMSAn integrated solution for kitchens located below the gravity sewer level. Separate food solids and FOG, collect removed grease and lift wastewater within a closed equipment arrangement.

Commercial kitchens below the sewer connection level need both grease management and reliable wastewater lifting. Installing separate tanks, pumps and controls can consume plant-room space and complicate coordination. This closed integrated system combines staged separation, grease collection and wastewater lifting in one project-oriented arrangement.
The enclosed design helps contain wastewater and grease within a serviceable system. Venting and odour management must still follow the approved project design.
The lifting section is selected according to the required flow and total dynamic head. Pump duty and standby configuration are model-dependent.
Separated grease can be transferred into an external collection container according to the configured operating sequence.
An upstream screening or solids-handling section helps prevent large food residues from entering downstream sections.
Integrated equipment can reduce the coordination work associated with multiple separate devices, subject to the approved layout.
Maintenance panels, collection containers and control components are arranged for routine inspection and servicing.
Kitchen wastewater enters the pretreatment and solids-separation section.
Flow passes into the grease-separation chamber, where free-floating FOG is separated from wastewater.
Separated grease is transferred to a designated collection container.
Pretreated wastewater enters the lifting section.
The pump system discharges wastewater to the downstream sewer connection according to level-control signals.
A lifting station is generally required when the kitchen drainage point is below the available gravity sewer connection or when the project cannot achieve the necessary gravity fall. The final requirement must be confirmed by the project drainage engineer.
Pump selection is based on the design flow, total dynamic head, discharge pipework and required duty/standby arrangement. These values should be confirmed before quotation.
The closed arrangement helps manage odour, but correct venting, sealing, cleaning and maintenance remain essential. No absolute odour-free claim should be made without defined test conditions.
Overall dimensions and access routes must be reviewed during selection. Where available, modular delivery or site assembly options can be evaluated for the selected model.
Routine work includes checking the solids section, grease collection container, pumps, level controls, vents, seals and internal chambers. The interval depends on kitchen loading and operating hours.
Watch the linked WoECO YouTube or Facebook video for a closer product introduction.
Upload the drainage layout and operating data. Our team will review the grease-separation capacity, pump duty point and preliminary equipment arrangement.